Saturday, April 26, 2025

Complete Cost Breakdown for Building a 120 Square Yards Single Story House in Karachi (2025)

Constructing a single-story house on a 120 square yard plot (approximately 1,080 square feet) in Karachi involves various costs that depend on material quality, labor rates, and finishing standards. Here's a detailed breakdown based on recent estimates:​


🏗️ Estimated Construction Costs (2024–2025)

1. Grey Structure (Foundation, Walls, Roof)

  • Materials: Includes cement, steel, sand, gravel, and cement blocks.

  • Labor: Skilled labor charges vary based on experience and work complexity.

  • Estimated Cost: PKR 1,500,000 – PKR 2,000,000

2. Finishing Works

  • Flooring: Options range from vinyl (PKR 55/sq ft) to wooden tiles (PKR 120/sq ft).

  • Woodwork: Custom cabinets, doors, and wardrobes.

  • Electrical & Plumbing: Wiring, switchboards, pipes, and fittings.

  • Paint & Ceiling: Interior and exterior paint, false ceilings.

  • Sanitary Fittings: Imported fixtures preferred for quality.

  • Estimated Cost: PKR 1,500,000 – PKR 2,500,000

3. Architectural & Approval Fees

  • Architect Fees: Approximately 3–5% of the total project cost.

  • Municipal Approvals: Building permits and other legal requirements.

  • Estimated Cost: PKR 100,000 – PKR 200,000

4. Miscellaneous Expenses

  • Utilities Connection: Electricity, water, and gas connections.

  • Contingencies: Unforeseen expenses during construction.

  • Estimated Cost: PKR 200,000 – PKR 300,000 


💰 Total Estimated Cost

Quality TierEstimated Total Cost (PKR)
Standard Finish3,300,000 – 4,000,000
Mid-Range Finish4,000,000 – 5,000,000
High-End Finish5,000,000 – 6,000,000

Note: These estimates are based on current market rates and may vary with time and specific project requirements.


📌 Additional Considerations

  • Material Selection: Opting for local materials can reduce costs, while imported or premium materials will increase the budget.

  • Labor Management: Hiring experienced contractors can ensure quality but may come at a higher cost.

  • Project Timeline: Delays can lead to increased expenses; efficient project management is crucial.

For a more precise estimate tailored to your specific needs and preferences, consider consulting with local architects or construction firms in Karachi. They can provide detailed quotations based on your desired design and material choices.